Kindergarten drainage hidden work process 2
2019-06-131617 Views

 arrange WaterLarge Image.jpg

Kindergarten decoration work process arrange Water manage way installation

1.Indoor establish manage adopt use UPVC plastic material arrange Water manage , manage way installation front , should UnderstandBuilding object structure structure and flat 、 establish surface structure become 。 familiar arrange Water work process KindergartenDesign drawing and Kindergarten decoration implement work direction case And soil build work process cooperate measure implement 。 surface manage should arrange Water manage installation , must must in bury manage lay set complete graduate 、 handle good acceptance hand continue back enter conduct 。 bury manage should in base soil flat whole firm real can rely emotion situation under enter conduct lay set 。 bury manage wear more Foundation pre stay hole hole hour , must must cooperate soil build according to DesignLocationAnd mark high implement work 。 in whole building floor structure structure implement work process in , should cooperate soil build work good manage way wear more Wall wall and building board pre stay hole hole and chisel hole work work 。 hole hole dimension such as Design no bright sure Regulation hour , can than manage material outside path large 50mm-100mm。 manage way installation front , must must inspection pre stay hole hole Location and mark high is whether standard sure 。 and must must clear remove manage material and manage material on dirty dirt miscellaneous object 。

2. manage way system system installation suitable in Wall powder brush structure bundle back connect continue complete become 。 installation room break hour open mouth place should temporary hour seal close 。 when implement work present venue AndMaterial store exist room temperature difference relatively large hour , manage material and manage piece should at installation front in present venue place place 1 fixed Time, make its Temperature connect near EnvironmentTemperature。 establish manage must must according to DesignRegulation setting inspection mouth 。 inspection mouth Location and towards towards should at inspect repair 。 dark install establish manage in inspection mouth place should install set inspect Door。 horizontal manage also must must according to DesignRegulation setting clear sweep mouth 。 establish manage and horizontal manage average according to DesignRegulation setting stretch shrink section and solid fixed support frame 。 manage end insert enter stretch shrink section place pre stay room gap should as : summer season ,5-10mm; winter season ,15-20mm。 support bear piece within wall should Smooth,And manage body room stay Have micro gap 。

3. manage way support bear piece room distance , establish manage outside path as 50mm should Not Large at 1.5M; outside path as 75MM and with on should Not Large at 2M, horizontal manage should as large at under table Regulation.

horizontal manage support bear piece room distance

outside path (mm)   40    50    75    110    160

room distance (mm)   400   500   750   1100   1600

4. horizontal manage slope degree should comply with Standard slope degree 2.6%, establish manage bear mouth outside side And decorate surface Distance should control system in 20-50mm room 。  

5. manage way match manage and adhesive connect work art , must must row Regulation execute conduct :

① saw manage and slope mouth

a  saw manage LengthAccording to real measure and Combine each connect connect piece dimension gradually floor sure fixed .

b  saw manage work with suitable select use thin tooth saw 、 cut knife and cut manage machine Etc. machine with 。 break mouth should flat whole and hang straight at shaft line , break surface place not Have responsibility what change shape 。

c  insert mouth place can use in number board file file become 15 degree to 30 degree slope mouth 。 break mouth thick degree suitable as manage wall thick degree 1/3-1/2。Length1 general not small at 3mm。 slope mouth complete become back should Will debris clear remove dry clean 。

② adhesive combine surface clear reason

manage material or manage piece in adhesive combine front should use cotton gauze or dry fabric Will bear mouth within side and insert mouth outside side try dry clean , make adhesive structure surface protect hold clear clean , no dust sand AndWater track . when Surface touch Have oil dirty hour , must use cotton gauze dipped in acetone Etc. clear clean agent wipe clean .

③ manage end insert enter bear mouth Depth

match manage hour should Will manage material And manage piece bear mouth try insert 1 time , in its Surface divide exit mark record , manage end insert enter bear mouth Depth not small at under table Regulation

manage material insert enter manage piece bear mouth Depth(mm)

    order   number          outside    path      manage end insert enter bear mouth Depth

       1               40            25      

       2               50            25

       3               75            40

       4               110           50

       5               160           60

④ glue adhesive agent apply brush

use oil brush dip glue adhesive agent apply brush adhesive connect insert mouth outside side and adhesive connect bear mouth within side hour , should shaft towards apply brush , move work rapid 、 apply wipe average even 、 apply brush glue adhesive should suitable quantity , not leak apply or apply wipe thick 。 winter season implement work hour especially must note meaning , should first apply bear mouth , back apply insert mouth 。

⑤ bear insert mouth connect connect

bear insert mouth apply brush glue adhesive agent back , should immediately find being DirectionWill manage child insert enter bear mouth , make its smooth straight , again add squeeze pressure 。 should make manage end insert enter Depth comply with divide mark record , and protect certificate bear insert connect mouth straight degree connect mouth Location being sure , still should protect hold quiet wait 2-3 minutes clock , prevent connect mouth cunning escape , pre system manage section section point room error difference should Not Large at 5mm。

⑥ bear insert connect mouth nurture protect :

bear insert connect mouth insert connect complete graduate back , should Will squeeze exit glue adhesive agent use cotton gauze or dry fabric dip clear clean agent wipe try dry clean 。According to glue adhesive agent nature can and climate strip piece quiet place to connect mouth solid ization as stop 。 winter season implement work hour solid ization Time should suitable when extend long 。 manage way blockage hour , not Use bring Have sharp side sharp mouth machine with clear poke 。