Kindergarten Design In open related installation standard
2019-11-202172 Views
1. Kindergarten in according to bright open about installation , should comply with with under Requirement:
① Light open about Location should at operate work , installation Location must must comply with DesignRequirement and standard Regulation。
② installation in same 1Indoor open about , suitable adopt use same 1 system row produce product , open about through break Location should 1 cause , operate work Flexible、 connect touch can rely 。
③ open about safe LocationRequirement is : open about side edge distance Door cabinet Distance suitable as 150-200mm, distance surface Height suitable as 1400mm。
④ open about installation allow allow bias difference value Regulation is : and row installation related same type number open about distance surface Height should 1 pull line open about related neighbor room distance not suitable small at 20mm。
⑤ related line should pass open about control system , people use residential strict prohibit setting bed head open about 。
2. in decoration Kindergarten implement work in open about connect line , should comply with with under Requirement:
① related line should pass open about control system 。 connect line hour should young thin debate recognize , knowledge other guide line related line And zero line , strict do to 1 control system ( immediately minutes break or connect through ) electric source related line , should make open about break open back Light with on not bring electric 。
② wrench open about through often as two quiet touch point , minutes other by two connect line pile connect connect ; connect connect hour remove should related line connect to open about on outside , and should connect become wrench towards on as open about , wrench towards under as about Light。
③ connect line hour not can connect reverse , whether then maintenance Light with hour , easy build become meaning outside touch electric or short road matter therefore 。 connect line back Will open about core solid fixed in open about box on ,Will wrench on white point ( red point ) mark record towards under surface installation ; open about wrench must must safe being , not card in cover board on ; cover board And open about core use machine screw thread solid fixed firm solid , cover board should tight paste Building object Surface。
④ double connect and with on dark board open about , every 1 connect immediately as 1 only single alone open about , can minutes other control system 1 lamp electric Light。 connect line hour , should Will related line connect connect good , minutes other connect to open about on 1 move touch point connect through connect line pile on ,Will open about line connect to open about quiet touch point connect line pile on 。
⑤ dark install open about should adopt use professional use box 。 professional use box 4 week not should Have empty gap , cover board should end being , and should tight paste Wall。