Kindergarten Decoration Glass Partition Installation
2018-11-051841 Views
(1) implement work standard prepare
Material: glass separate Wall use glass product type and thick degree according to DesignRequirement select use 。
(2) implement work Method
1. implement work hour , first according to drawing dimension in Wall on elastic exit hang line , and in surface and top shed on elastic exit separate WallLocation line 。
2.According to already elastic exit Location line , according to according to DesignRegulation under department do law ( build brick 、 board strip 、 cover surface board ) complete become under half department , and And two end brick Wall anchor solid 。
3. do on department glass separate Wall hour , first inspection wood brick is whether already according to Regulation bury set 。 natural back according to elastic line first establish rely Wall establish tendon , and use nail child AndWall on wood brick nail firm ; again nail on 、 under pillar and in room edge wood 。
(3) quality quantity Standard
1. main control Project
glass separate Wall work process use Material product type 、 rule grid 、 nature can 。 picture case and Color should comply with DesignRequirement。 glass board separate Wall should UseSafety glass 。 glass brick separate Wall build build in bury set pull structure tendon must must And base body structure structure connect connect firm solid , and should Location being sure 。 glass board separate Wall installation must must firm solid 。 glass board separate Wall glue pad installation should being sure 。
2.1 general Project
① glass separate WallSurface should color luster 1 cause 、 flat whole clean clean 、 clear clear Aesthetic。
② glass separate Wall connect seam should horizontal flat vertical straight , glass should no crack mark 、 lack damage and Scratch。
③ glass board separate Wall embed seam and glass brick separate Wall hook seam should dense real flat whole 、 average even smooth straight 、 deep shallow 1 cause 。
④ glass separate Wall installation allow allow bias difference and inspect verify Method should comply with quality quantity acceptance StandardRegulation:
● establish surface hang straight degree :2mm。
● shade sun corner direction being :2mm。
● connect seam straight line degree :2mm。
● connect seam high low difference :2mm。
● connect seam Width:1mm。